POS_SWP 10_Handling Pulp
IMPORTANT
Please Note you must agree and email your acceptance to all of the SAFE WORKING PRACTICES. Once you have read them, click here to see the Form at the foot of the last page
|
SWP: Handling Pulp |
Ref No: POS_SWP 10_Handling Pulp |
|
Page 1 of 1 |
||
Date: 05/07/21 |
||
Key Hazards |
Risks |
Personal Protective Equipment |
|
|
Do
|
Do Not Attempt to load the trailer without the driver being in attendance and overseeing the operation. Attempt to load the rear half of the trailer until the driver has moved the curtain to the front end of the trailer. Operate any plant equipment that you do not hold a valid certificate of competency for. Block fire escapes within the cargo storage areas. Drag the cargo along the floor when placing in the stacks. Attempt to lift units that have damaged band wires. |
Specific Training Requirements:
experience. |
|
Risk Assessments:
|
|
SWPs:
|
Load Plan for 17 Units
Load Plan for 15 Units
Load Plan for 26 Pulp Reels
< POS SWP 09 Emergency Evac from Hold | Download as PDF | POS SWP 011 USe Man Riding Cage > |